极端冬季天气下燃气发电机性能估计的多阶段概率框架 A multi-stage probabilistic framework to estimate gas-fired generator performance during extreme winter weather 预印本

⚠️ 本文为 预印本(arXiv 公开版本),尚未经过正式同行评审。作者自发公开,结论未经期刊审稿验证,阅读时请知悉。
发布时间:2026-10-03
👁️ 预览文献
💡 AI 中文简介
这项研究关注极端冬季天气如何导致美国燃气发电机组故障。由于电厂级数据不公开,研究者利用公开天气和电力需求数据,结合北美电力可靠性公司(NERC)的匿名故障记录,构建了一个三阶段贝叶斯概率框架。以纽约州2013-2022年数据为例,该框架依次估计机组故障的小时概率、故障时的可用容量和故障持续时间。结果发现,天气越冷、需求越高,故障概率越大、保留容量越低、持续时间越长。在最严酷条件下,小时故障概率达24%,可用容量降至额定值的13%;完全停机中位时长12.7小时,部分降额时长随容量损失从2.4小时增至7.1小时。该框架为电力公司提供了可迁移的基准,有助于运行规划和资源充裕性评估。
领域电力系统可靠性分析
适合谁读需要一定专业背景(电力系统、概率统计)
核心贡献1. 提出三阶段贝叶斯框架,利用公开数据和匿名故障记录估计燃气机组在极端冬季天气下的故障概率、可用容量和持续时间;2. 建立可迁移的基准方法,电力公司可用自有详细数据扩展以提高精度。
关键数据最严酷条件下小时故障概率达24%,平均净可用容量降至额定值的13%;完全停机中位时长12.7小时;部分降额事件时长随容量损失从2.4小时增至7.1小时。
推荐理由如果你关心极端天气下电网如何保持稳定,这篇论文用公开数据揭开了燃气机组故障风险的黑箱,数据扎实、方法可复制,值得一读。
关键词["燃气发电机", "极端冬季天气", "贝叶斯概率框架", "停电风险", "资源充裕性", "可靠性评估"]

原文摘要

查看英文原文摘要

Extreme winter weather has repeatedly disrupted gas-fired power generation in the United States, yet the plant-level data needed to systematically quantify outage risk remain proprietary. Using publicly available weather and electricity demand data together with anonymized generator contingency records from the North American Electric Reliability Corporation (NERC), we develop a three-stage Bayesian probabilistic framework for estimating winter-driven generator performance. Applied to New York State (2013--2022), the framework sequentially estimates: the hourly probability of a generator contingency event, the expected net available capacity conditioned on an event occurring, and the event duration. Colder conditions and higher electricity demand are associated with higher failure probability, lower retained capacity, and longer event duration. Under the most severe observed stress conditions, estimated mean hourly event probability reaches 24\% , while expected mean net available capacity falls to 13\% of nameplate rating. Full outage events have a median duration of 12.7 hours, while partial derating event duration increases from 2.4 to 7.1 hours with capacity loss severity. The proposed framework establishes a transferable baseline that utilities with access to plant-level records can directly extend to obtain more precise reliability estimates for operational planning and resource adequacy assessment.